Sheriff’s Training

Collage of design and construction pictures.

Rendered image of the front of the sheriff's training center.

Primary Project Manager: Joel T. Jones, MPA (919) 560-7993

Secondary Project Manager: James Faress, P.E. (919) 560-7963

Project Description

This project entails range upgrades to the existing Durham County Sheriff’s Training grounds and construction of a new 10,000sf instructional building.  The existing site is an outdoor firearms training range which was constructed over a closed landfill in 1985.  The range supports pistol and rifle practice, and currency training for Sheriff Department personnel.  Improvements to the range include re-grading and import of new fill for proper drainage, construction of berms to create four 180-degree training venues, new target-reveal systems, improved night lighting, replacement of existing covered shelter and enclosed viewing tower, PA system, paved parking, and re-build of rifle targets/shooting platforms.  The new 10,000sf building will include classroom/training rooms, staff offices, locker rooms/showers, and a grounds maintenance garage/workshop. 

Rendered image of the sheriff's training center.

Sustainability Highlights

  • Pursuing LEED Silver certification
  • Includes variable refrigerant HVAC systems (VRF), rooftop photovoltaics for power and domestic hot water, EV charging stations, and other sustainability strategies.

Rendered image of a classroom in the sheriff's training center.

Location

100 Electra Road, Durham, NC Map

Design Team

RND Architects: Architecture
Engineered Designs, PA: PM&E Engineering
Gardner & McDaniel, PA: Structural Engineering 
Thomas & Hutton, PA: Civil Engineering, Landscape Architect
Traci Rose Rider, PhD: LEED Consultant

 

Project Budget

  $18,160.343

Architectural overhead plan view of training facility.

MWBE Participation: 

To be determined/Pending formal bids

 

Current Phase:

Entering Construction Phase

 

Anticipated Schedule:

Start construction – Spring 2025