Let's Chat Label Charlemos Label
Skip to main content
Durham County Engineering and Environmental

FY26 Fee Schedule

A. SEWER SERVICE CHARGES

1. MONTHLY SERVICE FEES FOR COUNTY CUSTOMERS WITH CITY WATER

Consumption Rate Charge: $8.05 per hundred cubic feet

Water Meter Size

Monthly Service Charge

Water Meter Size

Monthly Service Charge

5/8”

$4.53

3”

$21.78

1”

$6.08

4”

$49.10

1.5”

$8.28

6”

$62.48

2”

$8.96

8” and above

$75.55

2. MONTHLY SERVICE FOR COUNTY CUSTOMERS WITHOUT CITY WATER

Number of Bedrooms

Monthly Charge

1 or 2 bedrooms

$78.59

3 bedrooms

$117.89

4 or more bedrooms

$157.19

All Other Facility Types

Consumption Rate x Consumption*

3. MISC. SEWER SERVICE CHARGES

Fee

Monthly Charge

Wexford STEP System Sewer Maintenance Fee

$25.96 per house

*See Fee Schedule Definitions on Page 8 & 9

 

B. ROUGEMONT WATER FEES

Total Water Usage Fee includes Administrative Fee + Base Facility Charge + Usage Charge

1. ROUGEMONT WATER ADMINISTRATIVE FEE

Fee

Charge

Rougemont Administrative Fee

$5.00 per month

2. ROUGEMONT WATER BASE FACILITY CHARGE

Meter Size

Charge

< 1” Meter

$18.00 per month

3. ROUGEMONT WATER USAGE CHARGE

Water Usage

Charge

< 10,000 gallons

$7.17 (per 1,000 gallons)

10,000 to 20,000 gallons

$10.76 (per 1,000 gallons)

> 20,000 gallons

$14.36 (per 1,000 gallons)

4. ROUGEMONT WATER ACCOUNT FEES

Fee

Charge

Rougemont Water New Account Deposit

$100.00

Rougemont Water Service Initiation Fee

$20.00

Rougemont Water Security Deposit

$50.00

Rougemont Water Disconnection Fee

$75.00

Rougemont Water Reconnection Fee

$100.00 (must be paid prior to service reconnection)

Rougemont Water After Hour Service Charge

$40.00

Rougemont Water Late Fee

$5.00

Rougemont Water Vacancy Service Charge

$25.00

Rougemont Water Meter Extraction Fee

$100.00

Rougemont Water Inspection Service Charge

$60.00 (each inspection)

*See Fee Schedule Definitions on Page 8 & 9

 

C. RECLAIMED WATER FEES

Total Reclaimed Water Usage Fee includes Administrative Fee + Base Facility Charge + Usage Charge

1. RECLAIMED WATER ADMINISTRATIVE FEE

Fee

Charge

Reclaimed Water Administrative Fee

$11.50 per month

2. RECLAIMED WATER BASE FACILITY CHARGE

Meter Size

Charge

5/8” or 3/4”

$18.00

1”

$18.00

1.5”

$24.00

2”

$30.00

3”

$80.00

4”

$120.00

6” or above

$150.00

3. RECLAIMED WATER USAGE CHARGE

Water Usage

Charge

Flat Rate

$2.94 (per 1,000 gallons)

4. RECLAIMED WATER ACCOUNT FEES

Fee

Charge

Reclaimed Water New Account Deposit

$100.00

Reclaimed Water Service Initiation Fee

$20.00

Reclaimed Water Security Deposit

2x Base Facility Charge

Reclaimed Water Disconnection Fee

$75.00

Reclaimed Water Reconnection Fee

$100.00 (must be paid prior to service reconnection)

Reclaimed Water After Hour Service Charge

$40.00

Reclaimed Water Late Fee

$25.00

*See Fee Schedule Definitions on Page 8 & 9

 

D. WATER AND RECLAIMED WATER CONNECTION FEES

1. WATER AND RECLAIMED WATER CONNECTION FEES

Fee

Charge

Water and Reclaimed Meter Fee

At Cost + 10%

Water and Reclaimed Water Tap Fee (installed by DCo)

At Cost + 10%

Water and Reclaimed Water Meter Set Fee (≤ 2” meter)

$105.00

Water and Reclaimed Water Meter Set Fee (> 2” meter)

$525.00

*See Fee Schedule Definitions on Page 8 & 9

 

E. DEVELOPMENT REVIEW FEES

NOTE: A 5% non-refundable Technology Fee applies to all Development Review Fees (Fees E.1 Through E.4)

1. PRELIMINARY COUNTY SEWER REVIEW FEE* (See definitions on Page 8 for when review fees are due)

Submittal Type

Review Fee

Re-Review Fee (Each)

Administrative Site Plan – Level 1

$65.00

$32.00

Administrative Site Plan – Level 2

$120.00

$65.00

Administrative Site Plan – Level 3

$360.00

$185.00

Administrative Site Plan – Level 4

$605.00

$300.00

Exempt Plat

$65.00

$65.00

Minor Plat / Final Plat

$90.00

$90.00

Major Plat

$300.00

$300.00

Preliminary Plat

$605.00

$605.00

Preliminary Plat Amendment

$360.00

$360.00

2. CONSTRUCTION DRAWING REVIEW FEES* (See definitions on Page 8 for when review fees are due)

Submittal Type

Review Fee

Re-Review Fee (Each)

Single Family House

$480.00

$235.00

Single-Family / Townhome Development

$1,810.00 + $22.00/lateral

$970.00

Multi-Family Development

$1,810.00 + $90.00/building

$970.00

Municipal / Commercial / Industrial Development

$1,810.00 + $0.90/LF of main/force main

$970.00

Commercial / Industrial Development –

Single Lateral only

$735.00

$420.00

Restaurant / Cafeteria Plumbing Plans

$605.00

$360.00

Core and Shell Building Plumbing Plans

$605.00

$360.00

Building Plumbing Plans – Upfit/Renovation

$970.00

$540.00

Private Lift Station

$1,050.00

$580.00

Public Lift Station

$5,250.00

$2,875.00

Grease Trap / Pretreatment Units*

$300.00

$65.00

Field Change– Single-Family House

$65.00 (each review)

-

Field Change– All Other Development

$605.00 (each review)

-

Sewer Extension Permit Application

Re-Review Fee

$120.00 (each review above two)

-

3. AS-BUILT REVIEW FEES* (See definitions on Page 8 for when review fees are due)

Submittal Type

Review Fee

Re-Review Fee (Each)

As-Built – Single Family House

$65.00

$65.00

Commercial / Industrial Development –

Single Lateral Only

$360.00

$235.00

As-Built – All Other Development

$360.00 + $0.30/LF of main

$235.00

4. SEWER VIDEO REVIEW FEES

Submittal Type

Review Fee (Each)

Optional Sewer Video Review*

$3.70/LF

Sewer Video Review

$1.85/LF ($500 minimum)

*See Fee Schedule Definitions on Page 8 & 9

 

E. DEVELOPMENT REVIEW FEES CONT.

5. MISC. DEVELOPMENT REVIEW FEES

Type

Charge

Variance Request*

$300.00 (each)

Alternative Design Application – Minor*

$1,210.00 (each)

Alternative Design Application – Major*

$3,020.00 (each)

Sewer Capacity Analysis

$5,410/meter for up to 3 months

Additional months will be At Cost + 10%

Engineering Capacity Analysis (up to 2 scenarios)

At Cost + 10%

Dye Testing

$120.00

Comment Review Meeting*

$185.00/hour ($185 minimum)

 

F. CONSTRUCTION INSPECTION FEES

NOTE: A 5% non-refundable Technology Fee applies to all Construction Inspection Fees (Fees F.1 Through F.3)

1. GENERAL INSPECTION FEES

Inspection Type

Charge

Not Ready Inspection Fee

$120 for each occurrence (must be paid before as-built approval)

2. SEWER INSPECTION FEES (Fee covers one inspection for the construction of sanitary sewer and the applicable testing. Any deficiencies notated during initial inspection or testing that requires a re-inspection will be charged the Re-Inspection/Failed Inspection fee)

Inspection Type

Charge

Sewer Main / Outfall (8” to 12”)

$3.70/LF

Sewer Main / Outfall (> 12”)

$6.00/LF

Sewer Lateral

$360.00/building connection

Force Main

$3.70/LF

Private Lift Station*

$605.00

Public Lift Station

$2,625.00

Oil/Grease/Sediment Trap Inspection

$300.00/each unit

Certificate of Occupancy Inspection - Single-Family

$37.00/lot (each inspection)

Certificate of Occupancy Inspection - All Other Development

$120.00/building connection

Re-Inspection / Failed Inspection Fee (excluding CO Inspection)

$120.00/hour (based on scheduled inspection time)

3. WATER AND RECLAIMED WATER INSPECTION FEES (Fee covers one inspection for the construction of sanitary sewer and the applicable testing. Any deficiencies notated during initial inspection or testing that requires a re-inspection will be charged the Re-Inspection/Failed Inspection fee)

Inspection Type

Charge

Water Tap Inspection (≤ 2" meter)

$300.00

Water Line Inspection (Main extension only)

$3.70/LF

Water Backflow Preventer Inspection Fee

$65.00 (each inspection)

Reclaimed Water Tap Inspection Fee (≤ 2” meter)

$300.00

Reclaimed Water Tap Inspection Fee (> 2” meter)

$185.00 per inch diameter of meter

Reclaimed Water Line Inspection (Main extension only)

$3.70/LF

Reclaimed Water Backflow Preventer Inspection Fee

$120.00 (each inspection)

Reclaimed Water Inspection Service Charge

$65.00 (each inspection)

Re-Inspection / Failed Inspection Fee

$120.00/hour (based on scheduled inspection time)

*See Fee Schedule Definitions on Page 8 & 9

 

G. INDUSTRIAL USER FEES

NOTE: A 5% non-refundable Technology Fee applies to the Industrial User Fees listed in Section G.1 through G.5

1. INITIAL PERMIT APPLICATION FEES*

Type

Charge

Single-Tenant Permit Application Fee

$1,825.00

Multi-Tenant Permit Application Fee

$1,825.00 + $120.00/tenant space

BSL Permit Application Fee

$1,210.00

Flow Reporting Permit Application Fee

$950.00

2. PERMIT RENEWAL APPLICATION FEES*

Type

Charge

Single-Tenant Permit Renewal Application Fee

$725.00/discharge monitoring point

Multi-Tenant Permit Renewal Application Fee

$725.00 + $120.00/tenant space

BSL Permit Renewal Application Fee

$605.00

Flow Reporting Permit Renewal Application Fee

$365.00

3. PERMIT MODIFICATION FEES*

Type

Charge

Single-Tenant Permit Modification Fee

$420.00/discharge monitoring point

Multi-Tenant Permit Modification Fee

$420.00 + $65.00/tenant space

BSL Permit Modification Fee

$420.00

Flow Reporting Permit Modification Fee

$365.00

4. PERMIT MAINTENANCE FEES*

Type

Charge

Annual Multi- or Single-Tenant Permit Maintenance Fee

$1,500.00

Annual BSL Permit Maintenance Fee

$725.00

Annual Flow Reporting Permit Maintenance Fee

$605.00

5. MISC. PRETREATMENT FEES*

Type

Charge

Pollutant Headworks Analysis Fee

At Cost + 15%

Industrial User Re-Inspection Fee

$250.00

Supplemental Documents Review Fee

$100.00/document

Authorization to Construct Fee

$420.00

Building Plumbing Plans – Upfit/Renovation

$970.00 initial review, $540.00 each re-review above two

Restaurant / Cafeteria Plumbing Plans

$605.00 initial review, $360.00 each re-review above two

Pretreatment Units

$300.00 initial review, $65.00 each re-review above two

Annual FOG Maintenance Fee

$250.00

FOG Re-Inspection Fee

$650.00

6. SURCHARGE FEES (Surcharges are applied for discharge concentrations that exceed the listed concentration)

Type

Concentration

Charge

BOD (Biochemical Oxygen Demand)

250 mg/L

$502.00 per 1,000 pounds

TSS (Total Suspended Solids)

180 mg/L

$87.00 per 1,000 pounds

TKN (Total Kjeldahl Nitrogen)

40 mg/L

$1.10 per pound

TP (Total Phosphorous)

5 mg/L

$9.90 per pound

*See Fee Schedule Definitions on Page 8 & 9

 

G. INDUSTRIAL USER FEES (CONT.)

7. MONITORING AND SAMPLING FEES

Type

Charge

Monitoring Administrative Fee

$150.00

Sampling Fee

$138.00

1,4-Dioxane

$140.00

Aluminum

$17.00

Ammonia

$22.00

Antimony

$17.00

Arsenic

$17.00

Barium

$17.00

Beryllium

$17.00

Bismuth

$60.00

BOD5

$28.00

Cadmium

$17.00

Chloride

$17.00

Chromium

$17.00

COD

$28.00

Copper

$17.00

Cyanide

$33.00

Fluoride

$24.00

Lead

$17.00

Mercury (Method 1631)

$154.00

Molybdenum

$17.00

Nickel

$17.00

Nitrate + Nitrite

$19.00

Oil & Grease (total)

$41.00

Oil & Grease (non-polar)

$58.00

Oil & Grease (polar)

$58.00

Organic Compounds (EPA 624 & 625)

$386.00

Pesticides (EPA 608 & 614)

$402.00

pH

$10.00

PFAS

$600.00

Selenium

$17.00

Silver

$17.00

Tellurium

$55.00

Tin

$17.00

TKN

$31.00

Total Nitrogen (TKN + Nitrate/Nitrite)

$50.00

Total Petroleum Hydrocarbons (TPH)

$150.00

Total Phosphorus

$25.00

Total Residual Chlorine (TRC)

$20.00

TSS

$20.00

Total Toxic Organics (TTO)

$605.00

Volatile Organic Compounds (VOC) (EPA 8260)

$138.00

Zinc

$17.00

Acetone, Ethyl Acetate, Isopropyl Acetate, Methylene Chloride, n-Amyl Acetate

$138.00 *Compounds are priced as one group run by EPA Method 8260

*See Fee Schedule Definitions on Page 8 & 9

 

H. SYSTEM DEVELOPMENT FEESa

Customer Type

Charge

Residential Dwelling Units – Single Family or Multi-Family

$1,250.00/bedroom

Motels or Hotels – with In-Room Cooking

$2,917.00/room

Motels or Hotels – without In-Room Cooking

$2,000.00/room

Swimming Pool, Bathhouses, Spa

$167.00/person

Nursing/Rest Home

$1,000.00/bed

Nursing/Rest Home with Laundry

$2,000.00/bed

General Business or Office Facilities – per Shift

$417.00/person

Factories excluding Industrial Waste – per Shift

$417.00/person

Factories or Businesses with Showers or Food Prep – per Shift

$583.00/person

Medical, Dental, Veterinary Office

$4,167.00/practitioner

Warehouse

$1,667.00/loading bay

Self-Storage Facility

$17.00/unit

Service Station/Gas Station

$4,167.00/plumbing fixture

Convenience Store - with Food Prep

$1,000.00/100 SF

Convenience Store - without Food Prep

$4,167.00/plumbing fixture

Store, Shopping Center, Mall with Food Service

$2,167.00/1,000 SF

Store, Shopping Center, Mall without Food Service

$1,667.00/1,000 SF

Restaurant – Full Service

$667.00/seat OR $667.00/15 SF of dining area

(whichever is greater)

Restaurant – Single Service (Exclusive of Fast Food)

$333.00/seat

Restaurant – Catering or Carry Out Only

$833.00/100 SF

School (Day) – with Cafeteria, Gym, Showers

$250.00/student

School (Day) – with Cafeteria Only

$200.00/student

School (Day) – without Cafeteria or Showers

$167.00/student

School (Boarding)

$1,000.00/person

Church – with Kitchen

$83.00/seat

Church – with Day Care, Camps

$417.00/person

Church – without Food Service, Day Care, Camps

$50.00/seat

Sports Centers (Mini Golf, Pool Hall, Arcade, etc.)

$4,167.00/plumbing fixture

 

Miscellaneous (Based on Average Daily Flow of Facilities Not Described Above)

$16.69/gallon

*For facilities discharging high strength wastewater, this rate will be increased proportional to the maximum strength ratio of the waste concentrations to the respective pollutant surcharge concentrations.

aSystem Development Fees are referred to as Capital Recovery Fees in the Durham County Sewer Use Ordinance until such time the Ordinance is revised.

 

Fee Schedule Definitions

Alternative Design Application - Major: A request made for a deviation from the Durham County Design Standards that significantly impacts design, construction, or future maintenance while still meeting the State Minimum Design Guidelines.

Alternative Design Application - Minor: A request made for a deviation from the Durham County Design Standards that does not significantly impact design, construction, or future maintenance while still meeting the State Minimum Design Guidelines.

Annual FOG Maintenance Fee: The Annual FOG Maintenance Fee covers the cost of administration and two required inspections each year. If an additional inspection is required beyond the two required, a FOG Re-Inspection Fee will be charged.

Annual Permit Maintenance Fee: The Annual Permit Maintenance Fee for industrial users will be billed for all permits that are in effect as of July 1st of each year and covers but is not limited to: compliance data review and judgement, inspection fees, and site visits required for permit administration.

As-Built Review Fees: Base review fee shall be paid at time of initial submittal and covers first two reviews, unless otherwise specified. Base fee applies per phase of project plans (i.e. if a 3-phase project is submitted the fee is 3x the base fee). For each additional review beyond two, the re-review fee shall be charged).

Authorization to Construct: The Authorization to Construct fee includes review of all pertinent information and initial inspection but does not include plumbing plan review. Additional fees will apply for plumbing plan review and/or permit modification.

BSL Permit: This is a stand-alone permit issued to industrial users that operates one or more Bio-safety Level Laboratories.

Comment Review Meeting: A meeting held to discuss questions regarding Durham County Utilities plan review comments. Time slots for these meetings will only be held every Thursday between 2 pm and 4 pm. Contact Durham County Utilities Project Management staff to schedule a time. Meeting will be billed at $150 per hour ($150 minimum) and instructions for making payment will be sent at time of meeting confirmation. If fees are not paid a minimum of 24 hours prior to scheduled meeting time, meeting will be canceled.

Construction Drawing Review Fees: Base review fee shall be paid at time of initial submittal and covers first two reviews, unless otherwise specified. Base fee applies per phase of project plans (i.e. if a 3-phase project is submitted the fee is 3x the base fee plus lot fees if lot fees apply). Phasing any type of project after construction drawing approval will result in a base fee charge per phase only. For each additional review beyond two, the re-review shall be charged.

Consumption (in gallons): Consumption is determined using NCDEQ 15A NCAC 02T .0114 (Wastewater Design Flow Rates).

Flow Reporting Permit: This is a stand-alone permit issued to any non-residential user for the purpose of tracking wastewater flow per current sewer capacity.

Initial BSL Permit Application Fee: This fee will be charged to industrial users submitting an initial Industrial User Permit Application. This fee includes review of up to 5 supplemental documents when submitted with the initial Industrial User Permit Application.

Initial Single-Tenant or Multi-Tenant Permit Application Fee: This fee will be charged to industrial users submitting an initial Industrial User Permit Application. This fee includes review of up to 10 supplemental documents when submitted with the initial Industrial User Permit Application.

Multi-Tenant: Any building or site that leases spaces to more than one Industrial User. Multi-Tenant permits will be issued to the building owner/property manager.

Preliminary County Sewer Review Fees: Preliminary County Sewer Review fees will be charged for the review of any site plans and plats located within the Durham County TWWTP Basin. The base review fee covers the first two reviews. For each additional review beyond two, the re-review shall be charged. The Preliminary County Sewer Review fees must be paid in full before site plans will be approved.

Optional Sewer Video Review: A voluntary procedure requesting Durham County to review sewer video prior to 30-days after installation or aggregate base course with first layer of asphalt installed. Comments provided as part of this review are preliminary and are not considered final review. Each project is still required to submit for Sewer Video Inspection 30-days after installation or aggregate base course with first layer of asphalt installed.

Pretreatment Units: Pretreatment units may include but are not limited to pH neutralization systems, sediment traps, and decontamination equipment.

Pump Station (Private) Inspection: Pump Station Inspection is to ensure all major components have been installed as required by NCDEQ. Engineer of Record is responsible to certify the pump station is operational and meets the NCDEQ permit.

Scheduled Inspection Time: Scheduled inspection times are based on established inspection timeframes identified within the online Durham County Utilities inspections portal

Single-Tenant: Any Industrial User that is the sole industrial occupant of a building or site.

Supplemental Documents: Supplemental documents may include but are not limited to biocide worksheets, safety data sheets, special discharge requests, and review of pilot project documents.

Tenant Space: This phrase refers to all possible suites, rooms, or spaces in a multi-tenant facility that may be individually leased to an industrial user.

Variance Request: A request made for a deviation from the Durham County Sewer Use Ordinance.