Utilities Development Submittal Instructions

Blueprints

1. Use Submittal Checklist below to ensure all required documents are completed and included with the submittal.

2. Complete the applicable required application forms. 

3. Ensure all files use the below naming convention.

  • Project Number – Project Name – Document Type – Submittal # (1st Submittal, 2nd Submittal, etc.)
    • Project Number - a Durham County Utilities project number will be assigned after the 1st submittal. This project number must be used for all subsequent submittals. This project number assigned will apply to construction plan and as-built submittals. 
    • Project Name - must match the name on the plans, applications, and forms.
    • Document Type - must match the document types shown on Submittal Checklist
    • Submittal # - this should be the submittal # for the entire project, not a specific document. For example, if this is the 3rd time submitting CDs to us for this particular project, but this is the 1st time submitting the Industrial Waste Survey, all submittal items would be labeled as 3rd Submittal 
    • Ex: 15-000 - Alexander Davis Page Flex – Public DEQ Extension Permit – 1st Submittal